My work schedule gets crazy again starting Oct 25th, so basically I have till then to get as much done on this side as I can. After that it will be pretty much dark when I get home (and probably won't feel like doing much!). The corner is stripped down and papered, plus the belt trim is stripped - so now I can start to shingle the corner and get the front finished. I started yesterday and have three rows done up to the porch roof along the side. The next level will start wrapping around the front. I have a few batches done so we'll see how far I get today, but the limiting factor on time again will be how fast I can get more batches painted....



I ran into a problem with the service cable. It appears that at some point in the past it was ripped off the house and then remounted about 6 inches away. The problem is they didn't his a stud! As I started prying hoping to work some of the siding out from behind it and be able to leave it in place - the entire bracket started moving - yikes. So I just worked around it for now leaving it everything in place. The sheathing is pretty thick, but with all the material between the bracket and the sheathing I don't think it grabbed to much wood. So my electrician buddy told me a trick to switch the triplex (wires coming from the pole) to a new bracket without having take on the full weight of it. It's a good 100 feet run to the pole, so I doubt I'd be able to hold on very long let alone try to fish onto a new bracket. I get into this more when I actually do it.
Another issue I had to finally deal with was a 1 1/2 inch conduit run that went from the service panel, up the outside wall along the service cable, then down along the belt trim and poke into the house in the from bedroom and the back bedroom/2nd floor kitchen. There were 5 circuits total which had to be disconnected from the main panel and pulled back to where they went back into the house on the second floor. Then I was able to remove all the ugly conduit. Two circuits were dedicated to outlets probably for window AC units, so I just eliminated them. Three others feed the third floor which was semi redone before I bought the house. Two of these seemed to power most of what I'm using up there, so I temporarily made a junction box in the front bedroom and powered these two a new feed I ran to power the front bedrooms. When these rooms are gutted I can run the lines up to the third floor and to the closet where the central AC will be and a sub panel.

No comments: