Well I dodged a heat gun bullet, the sanding worked. It's not mirror smooth (what 100 year old cabinet is??) but it looks pretty dog gone good. I used 60 paper with the orbital to knock off the loose stuff, followed by a round with 150 feathering all the rough edges and the chipped down areas. A good prime coat and two coats of color later... it's time for doors and drawers.
Wednesday, June 30, 2010
Monday, June 28, 2010
To Strip or Not to Strip
... that is the question. It just isn't feathering out with sanding like I hoped. The white is latex which doesn't seem to have a great bond to the older layers of paint underneath. But stripping this beast in 90 degree weather... ugh! I think I'll try the orbital sander a bit more. It's only a few spots that are bad, but once you start stripping it has to be all or nothing.
Friday, June 25, 2010
Built-In Progress
Wednesday, June 23, 2010
Pickin Up The Pace
Well for reasons I wish were different, work is progressing pretty quick again. Looks like a work strike is unavoidable. Even worse we've been sold to boot and the new company already cut half of management.
Scaffold work is finished and the outside is done except for the dormers on the 3rd floor. So it's back inside to make the final push in getting the kitchen done.
I'm working on getting all the woodwork finished and primed, then it will be some finish work on the walls and finally get everything painted and floor. I'm going to do the back and basement stairs while I'm at it.
Once I can get this done I can gut the upstairs kitchen and hit the front pair of bedrooms. All this work has to be completed before the end of summer so I can pass appraisal for a refi of the mortgage. I did start some small demo in the bedrooms while waiting for stuff to dry so I don't get swamped with trash all at once. I started with the drop ceilings. I'll do the panelling next.
Motivated or not it has to get done! Best case scenario I'll have most of the interior done by the end of the year and the finish line will be in sight. Worst case, there might be a sign out front and someone else will have to finsih this blog. What a crazy year. I almost look forward to gutting the bedrooms. I could really use some sledge hammer therapy!!
Scaffold work is finished and the outside is done except for the dormers on the 3rd floor. So it's back inside to make the final push in getting the kitchen done.
I'm working on getting all the woodwork finished and primed, then it will be some finish work on the walls and finally get everything painted and floor. I'm going to do the back and basement stairs while I'm at it.
Once I can get this done I can gut the upstairs kitchen and hit the front pair of bedrooms. All this work has to be completed before the end of summer so I can pass appraisal for a refi of the mortgage. I did start some small demo in the bedrooms while waiting for stuff to dry so I don't get swamped with trash all at once. I started with the drop ceilings. I'll do the panelling next.
Motivated or not it has to get done! Best case scenario I'll have most of the interior done by the end of the year and the finish line will be in sight. Worst case, there might be a sign out front and someone else will have to finsih this blog. What a crazy year. I almost look forward to gutting the bedrooms. I could really use some sledge hammer therapy!!
Tuesday, June 15, 2010
Goodbye Gutters
Friday, June 11, 2010
Hall House Gardens
The veggie gardens are taking off now! This is my 2nd year using the rasied beds and can't recommend them enough. The irrigation system is a nice feature too and can't wait till I can get the rain barrels going off the garage to feed into it.
Spinach, Kale, Broccoli, String Beans, Snap Peas
Lettuce, Roma Tomatoes, Snap Peas
Mesculine, Eggplant, Cucumber, String Beans, Tomatoes
Carrots, Radish, Peppers, Tomatoes
Wednesday, June 9, 2010
Waitin For Hangers
Wednesday, June 2, 2010
Another Pic From the Past
Subscribe to:
Posts (Atom)