Saturday, June 30, 2007

Dodging the Sun

The sun and I play a little game throughout the day.... I work in the shade on the driveway side of the house till the sun finds me. Then to the other side that is now shady until once again in the evening the driveway side is shady again. So I've been working between prepping and installing the kitchen window and continuing the foyer window project. The kitchen window was the largest of the new Pella's I ordered and a little more than I wanted to man-handle myself, so I stripped just enough around the opening since I was gonna have some help for a few hours. This time I prepped and added the top filler piece as usual due to the miscommunication in sizing - yet this time the oddball window was dead on what it was supposed to be??! So I had to remove the filler piece and then finally got the window in. It's mounted, caulked and ready for the rest of the outside woodwork to be stripped/primed/painted and that will wrap up the new windows on the first floor.



The foyer window project continues and I FINALLY finished stripping the paint tonight - what a lot of work that was. The next few days I should get the repairs done to the wood and get everything in primer. The tin roof you can see is done with two coats of Tinner's Alkyd Red roof/gutter paint made by Gateway Paints. This is the closest you can find to the old red lead paints used on metal roofs back in the day. I'm happy with the results so far and eagerly await for the windows to be finished so I can pick them up in Cape May and get them installed - what a difference they will make.




I won the jointer on EBAY and should hopefully pick that up this week. Now I have enough tooling to at least start making the main 1x6 pieces for the baseboards.

Tuesday, June 26, 2007

Meet the Beast

My buddy John was kind enough to let me have this 300 pound monster of a saw. It is a DeWalt radial arm saw made around 1945. Believe it or not there seems to be a bit of a demand for this particular saw, and not much comparative in scale or quality available today. It's got a 12" blade and a true 2 HP motor. Everything is fully adjustable and the action and precision is unbelievable for a saw of this age. And this monster will do just about any cut imaginable - it has 24" travel across the arm, arm height is adjustable left/right and up/down, the saw rotates 360 degrees horizontal and tilts 90 degrees down.




After 60 years of service it needed a good cleanup/restoration and it appears to be almost good as new again. My dad welded up a stand for me to make this beast a bit more mobile (yes, this was supposedly their "portable" model!), and I constructed a new surface table/guide based on the original book John gave me with the saw. Now I just need a new blade and get the table "trued" up to the blade and I'll be ready for some serious cutting. One last key tool needed for my trim/woodwork resto shop is a jointer. John has a 4" I can use but I have my eye on a 6" I may lock in this week. Of course I may still use his for smaller work....


Monday, June 25, 2007

Getting Ready For Foyer Windows

Hopefully in a few more weeks I should have the foyer windows that are being custom made from original pics of the house. He's been held up a bit finishing up a Showcase House project in Cape May. In the meantime I removed the other aluminum double hung window and started the fun filled project of stripping paint. I'm about half way done at this point. There will be some damage to deal with and then everything will get painted up and ready for the window install. The roof I decided to deal with as well while I was working in this area. There was a layer of asphalt shingles nailed to the old tin roof that were probably done in 1971 during the apartment conversion (destruction) - and these were shot. The roof was in surprisingly good shape and all I really needed to do was fill the nail holes and some separations from the wall, then do a thorough scrape job. I finished up with a good coat of Rustoleum primer and today ordered some tinner's red oxide paint... this is the red paint you see on old metal roofs and evidence of it was on this roof. Apparently once very easy to get in your local hardware store, it now took some serious googling to find a supplier - and not have to buy in mass quantity. I only need half a quart at best.


Wednesday, June 20, 2007

Back Stairs Window Finished

I finally completed the restoration and installation of the salvaged stained glass window in the back staircase. The PO's removed the original window at some point and replaced it with glass block - not really appealing. This window definitely makes a huge difference both inside and out in what before was an eyesore and now a nice focal point. All that's left i s final paint and the inside stripping the jamb and painting which will get done when I finish restoring the staircase next winter.



Sunday, June 17, 2007

Almost A Shop

The garage is finally powered up, even though I ran 125 feet of wire and of course ended up 3 feet short - never fails. I have a 40 amp sub-panel with a lighting circuit, a 20 amp outlet circuit and a 20 amp 220v outlet circuit. I sleeved the wiring in conduit along the stone walls so they should be well protected. I installed 3 cold weather fluorescents which I haven't had a chance to use at night to see if it's going to be enough lighting.





The outside lights are wired through a photocell mounted in the LB cover feeding the main power into the garage and this is working great. These lights are restored cast iron fixtures found on EBAY - amazingly at different times yet they are a prefect match!



The shop is now about ready. Here is the latest addition to the tool collection - a Craftsman scroll saw probably from the 1950's with a 24 inch throat. This sucker really ways a ton. And the winning bid - $15.00... a real deal! I bought this with the sole purpose of cutting out the reproduced dining room window seat, but I'm sure I'll find many other uses.



The butler stairs window is about done too. Finally finished glazing and now just need to prepare the jamb and install. I hope it's the last window I have to glaze cause I just can't master this art. Maybe big square panes are easier, but these little triangle and diamonds are tedious and just don't come out as nice as I would like. But I guess from afar they won't look to bad.

Tuesday, June 12, 2007

The Big Dig

Last few days have been spent digging the path too run electric to the garage. It's about an 80 foot run to the house and includes running under the driveway and a sidewalk - and this was the easiest route! I'm running 8-3 able which will give me 40 amps to the garage (knocked down one notch due to the long distance). The run will be inside 3/4 PVC conduit except for under the driveway. To get across the driveway I dug a shallow hole at one side and about 30 inches down on the other. I drove a 3/4 black iron pipe at as slight a slope as possible with a cap on the end so it would not fill with dirt. A 10 foot pipe just made it across and I ended up at the bottom of my deep hole. For the sidewalk I drove a pipe and was able to pull it back out and run the PVC through the hole made by the pipe, so the only break in the piping will be at the driveway. I end up under the porch where an existing hole was made to run porch outlets. The cable is halfway pulled now and then I'll need to wire up the garage and I'll finally have a real shop to work in, and not the first floor of the house or the yard.


Saturday, June 9, 2007

Shingle Siding Finished

My order of shingles finally came in (1 square this time) and back to the clothesline priming and painting and hanging to dry.... and the neighbors still shake their heads in amusement. I finally was able to finish the dining room and for my first shingle siding job, it came out pretty good, especially for not being just a flat wall. I finished off with a piece of trim at the top and now this wall is ready for final paint.



While I was in the groove, I went and did the 2 rows under the foyer window as well. I left the under course in place this time since they were in OK condition. I just laid some tar paper over top and added the new shingles. Just need to strip the rest of the window, prime, paint, and await the new windows being made - this should really turn out well and be a nice focal point for this side of the house. Only shingles left to replace on the first floor is on the little porch peak and I may do the garage front this year.




Finished

Tuesday, June 5, 2007

The Garage Solution

So how did I get the door from a fancy 500 pound immovable wall to a functioning roll up door?? With just a $2.00 part of course. I ended up buying an eye bolt for each cable that is closed about 320 degrees - just open enough to slip the cable through. These act as a guide for keeping the cable lined up from the bottom attachment point on the bottom panel, up to above the top panel. Then through the eye and a slight change in direction clearing the beam and wrapping around the winding drum. As the cable moves across the drum the eye keeps the cable in place. Granted there is a slight concern for wear over time and a permanent solution is in the works. But I probably could get several years from this solution easily and it proved my idea will work. Long term I would like to make a pin with a wide roller that will keep the cable in line, but will also let the cable drift some (unlike the sheave with a single fixed groove), and will roll so there is no wear between it and the cable.

With this solved came adjusting the springs. These springs have two set screws that you loosen, then insert a 1/2 inch cold rolled steel rod into one of the holes in the winder and crank clockwise, when you can't move anymore, take a second rod, insert in another hole, pull out the other rod and keep going - counting the number of turns as you go on the spring. Of course a few turns in and the spring really starts to fight your arm! I didn't have the factory winders, so I made a pair out of 18inch long rebar and grounded the ends down till they inserted snug into the winders - worked really well. Now the chart I downloaded from Coplay (marked on the track) said a 7 foot door should be about 7 1/2 turns. The setup they showed only had two springs, mine has four - but I figured it would get me in the ballpark.


Framing complete

So 6 1/2 turns on the outside springs, I then started on the inboards.... on the 5th turn the door started to raise itself! Guess the charts wrong - imagine that, so backed down to 4 turns on each inboard spring and the door stayed shut. I pulled the door up with no real effort and actually had to slow it down near the end of the run. But then... I couldn't pull it back down! There was still to much tension on the springs, so with the help of my neighbor we got it back down. I took 2 turns off the outside springs and tried again - PERFECT! One arm up, one arm down, cables stayed in place.


Door goes up

Now all to be done was build a filler for between the top of the door and the header and trim everything out. Here are the final results. Now all I need is a little power and I can start thinking about reproducing some woodwork.



Door goes down - ready for paint and power

Sunday, June 3, 2007

A Garage Story

Since first moving in, I've been really wanting to put a door on the garage. I really couldn't set up shop until then or risk having anything of value stolen - easy pickins. Well finally about a month ago I picked up a nice solid wood door that looks like carriage doors but is a roll up. It came complete with torsion springs and Genie lift - all I had to do was make it work.

The garage was designed originally for carriage doors and is solid 12 inches of stone. The opening is 17 feet and the door is 15 - so first I had to add 12 inches of wall to each side (this pic is on the previous post). The beam spanning the opening is an I-beam boxed in with wood. I ended up anchoring these walls to the top beam and drove steel rods through the base and about 18 inches into the ground. Later I will be adding some L-brackets to anchor into the floor and up onto the vertical parts of these filler walls.

Next with the bottom panel in place I started laying out the tracks and mounting brackets. This is where not having any instructions started to be a PIA! My first go around I had the brackets mounted on wrong face. I new the cable that pulls the door needed a channel to sit in and so I shimmed everything in to create a void.... well after doing this and seeing that the top track wouldn't line up.... take everything down, rip out the 2x6 shims and remount correctly. OK, so now the vertical tracks were right - now for the top tracks. I spanned double 2x6's between the two beams supporting the roof and nailed boards on the bottom so these could float left and right. The ends of the track get attached to these beams and once installed I could square everything up by moving the beams and then lock everything in place.

Torsion springs and tracks mounted

Well, that wasn't to bad - still a few evenings of work. Now to figure out the torsion springs. This is a real monster, 4 springs, two shafts that couple in the middle, brackets between each pair of springs, and end brackets with bearings for the shaft to rotate, plus the winding drum to roll up the cable attached to the bottom of the garage door. I had 8 1/2 inches between the top of the door and the beam, plenty of room to mount underneath - noting to line up the winding drum with the cable channel. So I get this act up and mounted and figure hey - not so bad - then I visualize the door coming up and guess what? It will smack right into the middle of the drum. I forgot to mention that the end brackets are supposed to mount where vertical and horizontal brackets all meet, but I didn't have room because of the beam above. So I mounted it a few inches lower.... now I knew why it had to go exactly where it was designed to mount.



Closeup of mounting bracket - see a problem here??


Great - so now what?? Can't mount under the beam, can't mount on the side of beam because the drums won't line up with the cable channel, don't want to take everything down to square one and remount walls to back edge of beam (later saw that this wasn't possible either!)





Great looking door.... but how do you open it???

Next time - the solutions.

Tuesday, May 29, 2007

Shingles - From Roofs To Walls

... and never had done either before, but you gotta learn somehow. The dining room wall is really taking shape now. I have learned one thing already - buy Pre-Primered cedar shingles! Boy how tedious that is and I only did 1/4 square. I did find rolling was a bit faster than brushing, but not much. Doing this now on all sides should help insure a long lasting paint bond since they will be sealed on all surfaces.


the neighbors were quite amused


After that was done, then they were ready to hang. The starters were already done so I started straight with the first coarse on up. The minimum distance between the edges of overlapping shingles needs to be at least an 1 1/2 inches. For the majority of this though I was staggered by half a shingle - which were all about 5 inches wide. For the reveal, I noted the old shingles before I tore them off. They were roughly between 6 and 6 1/4 inch - and for the new install I kept them at 6 1/8 inch except for the last two rows that had to be 6 1/2 to meet the top of the window exactly. This row gets tricky since they go from the wall to hanging over the window trim, shedding water over the windows - and this row needs to line up across the walls as well in order to look right. For securing the shingles I'm using 6d - 2 1/2" stainless steel ring-shanked nails. A little pricey, but I shouldn't ever have shingles coming down do to rusting nails.





This is where I got to before I ran out, so I will need to order one more box to finish this and for under the foyer window (only 2 rows there). I painted what was up with the color I decided on to get a better vision of how it will look over a broader area and with the stone work.





Next time..... adventures in hanging used garage doors, without instructions (not even chinese), pictures, diagrams, or a normal garage to install it in - and the ending yet to be written....

Sunday, May 27, 2007

A New Toy

Oh what fun will be had when I get this baby running! It's a JET Planer/Molder that will do up to 13 inch wide material and 6 inch thick. Doesn't look like there's too many years on this and should certainly work for what I need to do. This will turn that big pile of rough sawed red oak that's been drying in the garage for the past year into baseboards, casing, even the dining room window seat.... the possibilities are endless. Next step is getting a set of knives made to match the profile of the original molding.





Another great find on - yep - you know the site!

Friday, May 25, 2007

Knocking Down The "To Do" List

The past week has been spent after work wrapping up some of the misc. projects left undone. First thing was replacing the last column which finally arrived. This went just like the others and now I can sit on the porch worry free of collapsing roofs.




Next project almost done is the side parlor window. The new Pella is installed and the woodwork ready for paint. I have one Pella left to install (kitchen) plus finish restoring the butler stair window and install. I gave the "go ahead" to have the foyer windows made by the guy I bought the garage doors from. I should have them in about a month. A surprise was that his prices included glass and glazing - so they will be pretty much ready to install and he is using the older style "wavy" glass. Also they will be exact copies of the originals based on the pictures I have from the Hall family.


I started working on the garage this week too. First was jacking up the main support beams that support the ridge beam. One was split in the middle all the way through and patched with two scraps. I was able to raise this about 2 - 2 1/2 inches. The front beam was not as bad. Both are now sistered with a 2x8 on each side. Then I cleared out some misc. wood and now it's ready for joists to be added to support plywood for overhead storage. I removed all the old wood and rails from the previous garage door that has long since disappeared down to the stone and beam spanning the entrance. I staged the bottom section and I needed to build 12 inches out from each side of the stone wall to meet the door and also support the track system. I doubled up the 2x4 studs and for the base used pressure treated. That's about as far as I've got so far on the door.

Monday, May 21, 2007

My First Roof

... and I wish it was my last! What should have been just a small tear off and replacement job turned real ugly. The 1 story section that comes off the back was the only roof that was not replaced by the previous owners a few years back. I had some days off and the weather is still cool, so I thought this would be the opportune time to get this out of the way.

The first thing I discovered is that I needed to tear off the bottom few rows of cedar shakes where the roof meets the main house in order to redo the flashing properly - no big deal here. Next came the tear off. There was two layers of shingles on top of the original tin roof. The shingles weren't too bad, but I can't begin to tell you what a PIA getting the metal roof was. Finally when the layers were stripped down to the old sheathing this is what I found.






What was once a porch was sheathed in bead board and water must have leaked under there for a long time in the past cause it was completely rotted. I couldn't tell from the inside when I was insulating because of all the paint disguising the problem. Also the last section of sheathing along the eave was bad (this was already replaced once when they tore out the old roof gutter system. Plus the end boards were shot as well. Besides the sheathing, the tails of more than half of the joists were bad which I already new would need some work.






Murhy showed up.... see the clouds!





I lucked out and ended up having a ready supply of random width planks just the right thickness from crating material I salvaged from work. We ended up cutting all the tails off flush with the house, then moving a 13 inch wide plank from the middle of the roof down to the end leaving about 5 inches overhanging past the wall. I wanted this to be bead board since the underside would be exposed, but this plan would have to be modified in order to maintain strength of the eave. From this starting point, the rest of the roof was able to be patched where needed until finally the roof was pretty solid. It was a race against time and rain, so I didn't get to many shots of this part. By the end of the day I was able to get 30# tar paper rolled out and then plastic over this for the overnight rains that were originally not predicted - go figure!

Next day before any shingling was to be started, the underside of the eave had to be dealt with. I really wanted to keep the exposed look like original with bead board showing on the underside, so a little creativity had to be used to still keep this and also maintain strength of the overhanging roof that had been damaged so bad. Here is a mock up of what I came up with.


template for eave structure

It's a pre primed 1x6 that runs along the back covering up the bays between the joists and the nailed edge of the last clapboard. Next from an original tail that was cut off, I made a template for a fake tail that will be mounted every 24 inches like the originals and secured from the back side of the 1x6. Finally, bead board will be mounted along the top of this and screwed down though the tails. This was made in one 22 foot long piece and had to have a staggered joint in the middle between the 1x6 and bead board section. A scrap was secured to the 1x6 just to hold the joint in place while the assembly up and mounted. The bead board was spliced in the middle of tail and needed no reinforcement. A nailer was also added in the bay where the 1x6 joint would land on the wall.



And here it is in place on the house, secured both to the wall and through the overhanging roof sheathing. In the end it turned out as good as I could hope and you would be fooled that this is a mounted assembly and not part of the rafters and roof construction. And strength wise, well I stood on the edge and it didn't move at all - rock solid. Once the drips are added along the edges, the seams are all covered and the illusion is complete.




can you tell??



Now, finally was time for the shingles. I added the drips and starter coarse along the edge and sides. Then started shingling. This part really wasn't hard and what they say about the architectural shingles having almost no waste really is true - almost none. Once I reached the flashing point I rolled tar paper along the top section of roof and up onto the wall. I've added a temporary piece of flashing while my dad makes up some nice heavy galvanized section at work, since they have a nice wide break there. Once this is installed, a last section of shingles will be cut and glued on top of the flashing, and a starter coarse of cedar shakes will be mounted over the wall section of flashing.This will hopefully suffice until next year when I start the second story siding job.




I think I'll wait next till year to do the roof on the garage!

Saturday, May 19, 2007

Waiting For Shingles (and more discoveries)

I installed the starter courses for the dining room wall. These are low (D) grade white cedar and get overlapped by the first exposed course of higher grade shingles. I ordered some that should be here this week. I will have to prime them first and then install.




Since Thursday I've been working on the back roof project - and like the old saying goes - what you plan on doing and what you find are always two different things. I'm too whooped to go onto it yet, but let's just say three layers of roof and lots of rot to deal with. It looks like there will be a happy ending though thanks to my buddy John lending a needed hand and ideas - it's just about done and really looks good now.



what's under here??

While removing the bottom courses of cedar shingles tonight where the roof meets the main house in order to start flashing the new roof - I uncovered these goodies. It's a John Wanamaker box lid with L. N. Hall and the house address plus a sheet from Philadelphia Public Ledger - Dec. 26, 1917. I suppose Norris must have had to do a patch job on the siding to fix a leak and the box top was from a Christmas present he gave to Lulu that he decided to shove in there with a newspaper for me to find 90 years later.....




Thursday, May 10, 2007

A Little Of This - Little Of That

I've been hitting the house on several fronts right now. I continued the dining room windows getting the side stops in and caulking everything up. When the sun got strong in this side, I would jump to the other and work on stripping the side parlor window. Tonight I was able to finish that, so now it's ready for some sanding, filling and priming. Then the new window can go in. Back on the dining room side I primed all sides of the new bead board for the soffet under the overhang that's above the dining room bowed wall. I laid out the old boards I took down (in pretty bad shape) and used them to trace the curved cut out onto the new ones. This worked pretty well and getting the new soffet ended up not to be much of a challenge. All this needs now is a little caulking and painting when the rest of this wall gets done.


new bead board soffet

This afternoon I helped my buddy John make a lumber run with my truck and frame out a deck at his girlfriends house. This is another foursquare about the same age as the Hall house except brick construction. What's cool about this place is that it's pretty much untouched and has some impressive original woodwork in original finish and leaded glass work.


Also added a few more paint samples for outside. We finally have settled on a color - it's the middle one in the pic. It's called "Field of Pines" - made by Valspar. This will be the body color in flat, then trimmed out in standard semi-gloss white. This should look good with the stonework. The green will also be used to accent the mostly white porch. I'm debating using a dark red just on the window sills to add a little "something", but I might just keep things simple. We'll see.



This should be pretty much it till next week - I work all weekend and then going to Cape May for three days staying at a restored B&B. Cape May is a really neat town, like stepping back in time. Should definitely get a little needed inspiration (and even some relaxing time!)

Sunday, May 6, 2007

Dining Room Wall Con't...

Another full day spent on the outside wall of the dining room and things are starting to take shape. After a morning of applying and sanding filler in the bad spots and nail holes - the afternoon was spent getting a coat of primer on all the woodwork. Next I made up some flashing for where the siding meets the sill piece - the original rusted through pretty bad. Then I covered the siding with tar paper which is now ready for new shakes. I still need to add the side window stops, do all the caulking, touch up a few bad spots with more filler, and then will be ready for paint.



While waiting for the filler to dry, I removed the capping from the windows on the kitchen/parlor side of the house. Looks like this won't be as bad as I thought to strip - pretty well dried out and flaking off like the dining room side. I figured this was the shady side and would be a bit more intact. So hopefully I'll be changing out these windows sooner than I thought.


Saturday, May 5, 2007

Dining Room Windows And Siding - Officially Retired!

Another busy day at the Hell.... oops I mean Hall House. I set up scaffolding yesterday loaned by the best neighbors ever - thanks again Mike. This morning I finished scraping the wood work around the windows and then tore off the shingles on the dining room wall. Also removed was the soffet wood above - also in bad shape. Underneath looked pretty good, so all I'll need to do is apply new siding, flashing, soffet, etc.



Before you can construct... you must destruct!



With the destruction done, it was time to happily remove the 1970's windows - and none too soon. The left one almost fell apart taking it out. Next was adding the filler pieces up top like the parlor windows and window stop. I couldn't do the sides until the new window was in, because of the design of the sill which inside is higher than part that the window sits on.



Best thing about the old windows was their scrap value


A few hours later I had all three windows shimmed and secured. Next was a quick sanding of the woodwork and applied a hardener to some areas that had degraded and/or split open. Tomorrow the wood will get some filler and another sand, a coat of primer, and the side window stops can be installed. I need to order siding shingles - I finally decided on the HardiShingle since I was happy with their clapboards I used on the back. If I'm satisfied with the first floor installation than I will use them when I do the second/third floors. If not then it will be pre-primed white cedar, which will no doubt be more frequent maintenance than the fiberboard. I know nothing will look exactly like real cedar, but I'm hoping it's close enough. At least it's not vinyl which just isn't right for this type of house.




Nice new windows with our nice "new" antique oak dining table


I finished up setting the tops of the four columns so far installed and caulked both the tops and bottom in place. Now just waiting for the correct fifth one to arrive. Then it will be a quick sand, primer, and paint.

New columns ready for prime and paint