Saturday, June 30, 2007
Dodging the Sun
Tuesday, June 26, 2007
Meet the Beast
Monday, June 25, 2007
Getting Ready For Foyer Windows
Wednesday, June 20, 2007
Back Stairs Window Finished
Sunday, June 17, 2007
Almost A Shop
Tuesday, June 12, 2007
The Big Dig
Saturday, June 9, 2007
Shingle Siding Finished
Finished
Tuesday, June 5, 2007
The Garage Solution
Framing complete
So 6 1/2 turns on the outside springs, I then started on the inboards.... on the 5th turn the door started to raise itself! Guess the charts wrong - imagine that, so backed down to 4 turns on each inboard spring and the door stayed shut. I pulled the door up with no real effort and actually had to slow it down near the end of the run. But then... I couldn't pull it back down! There was still to much tension on the springs, so with the help of my neighbor we got it back down. I took 2 turns off the outside springs and tried again - PERFECT! One arm up, one arm down, cables stayed in place.Door goes up
Sunday, June 3, 2007
A Garage Story
Torsion springs and tracks mounted
Well, that wasn't to bad - still a few evenings of work. Now to figure out the torsion springs. This is a real monster, 4 springs, two shafts that couple in the middle, brackets between each pair of springs, and end brackets with bearings for the shaft to rotate, plus the winding drum to roll up the cable attached to the bottom of the garage door. I had 8 1/2 inches between the top of the door and the beam, plenty of room to mount underneath - noting to line up the winding drum with the cable channel. So I get this act up and mounted and figure hey - not so bad - then I visualize the door coming up and guess what? It will smack right into the middle of the drum. I forgot to mention that the end brackets are supposed to mount where vertical and horizontal brackets all meet, but I didn't have room because of the beam above. So I mounted it a few inches lower.... now I knew why it had to go exactly where it was designed to mount.
Closeup of mounting bracket - see a problem here??
Great - so now what?? Can't mount under the beam, can't mount on the side of beam because the drums won't line up with the cable channel, don't want to take everything down to square one and remount walls to back edge of beam (later saw that this wasn't possible either!)
Great looking door.... but how do you open it???
Tuesday, May 29, 2007
Shingles - From Roofs To Walls
the neighbors were quite amused
After that was done, then they were ready to hang. The starters were already done so I started straight with the first coarse on up. The minimum distance between the edges of overlapping shingles needs to be at least an 1 1/2 inches. For the majority of this though I was staggered by half a shingle - which were all about 5 inches wide. For the reveal, I noted the old shingles before I tore them off. They were roughly between 6 and 6 1/4 inch - and for the new install I kept them at 6 1/8 inch except for the last two rows that had to be 6 1/2 to meet the top of the window exactly. This row gets tricky since they go from the wall to hanging over the window trim, shedding water over the windows - and this row needs to line up across the walls as well in order to look right. For securing the shingles I'm using 6d - 2 1/2" stainless steel ring-shanked nails. A little pricey, but I shouldn't ever have shingles coming down do to rusting nails.
This is where I got to before I ran out, so I will need to order one more box to finish this and for under the foyer window (only 2 rows there). I painted what was up with the color I decided on to get a better vision of how it will look over a broader area and with the stone work.
Next time..... adventures in hanging used garage doors, without instructions (not even chinese), pictures, diagrams, or a normal garage to install it in - and the ending yet to be written....
Sunday, May 27, 2007
A New Toy
Friday, May 25, 2007
Knocking Down The "To Do" List
Next project almost done is the side parlor window. The new Pella is installed and the woodwork ready for paint. I have one Pella left to install (kitchen) plus finish restoring the butler stair window and install. I gave the "go ahead" to have the foyer windows made by the guy I bought the garage doors from. I should have them in about a month. A surprise was that his prices included glass and glazing - so they will be pretty much ready to install and he is using the older style "wavy" glass. Also they will be exact copies of the originals based on the pictures I have from the Hall family.
I started working on the garage this week too. First was jacking up the main support beams that support the ridge beam. One was split in the middle all the way through and patched with two scraps. I was able to raise this about 2 - 2 1/2 inches. The front beam was not as bad. Both are now sistered with a 2x8 on each side. Then I cleared out some misc. wood and now it's ready for joists to be added to support plywood for overhead storage. I removed all the old wood and rails from the previous garage door that has long since disappeared down to the stone and beam spanning the entrance. I staged the bottom section and I needed to build 12 inches out from each side of the stone wall to meet the door and also support the track system. I doubled up the 2x4 studs and for the base used pressure treated. That's about as far as I've got so far on the door.
Monday, May 21, 2007
My First Roof
What was once a porch was sheathed in bead board and water must have leaked under there for a long time in the past cause it was completely rotted. I couldn't tell from the inside when I was insulating because of all the paint disguising the problem. Also the last section of sheathing along the eave was bad (this was already replaced once when they tore out the old roof gutter system. Plus the end boards were shot as well. Besides the sheathing, the tails of more than half of the joists were bad which I already new would need some work.
Murhy showed up.... see the clouds!
I lucked out and ended up having a ready supply of random width planks just the right thickness from crating material I salvaged from work. We ended up cutting all the tails off flush with the house, then moving a 13 inch wide plank from the middle of the roof down to the end leaving about 5 inches overhanging past the wall. I wanted this to be bead board since the underside would be exposed, but this plan would have to be modified in order to maintain strength of the eave. From this starting point, the rest of the roof was able to be patched where needed until finally the roof was pretty solid. It was a race against time and rain, so I didn't get to many shots of this part. By the end of the day I was able to get 30# tar paper rolled out and then plastic over this for the overnight rains that were originally not predicted - go figure!
Next day before any shingling was to be started, the underside of the eave had to be dealt with. I really wanted to keep the exposed look like original with bead board showing on the underside, so a little creativity had to be used to still keep this and also maintain strength of the overhanging roof that had been damaged so bad. Here is a mock up of what I came up with.
template for eave structure
It's a pre primed 1x6 that runs along the back covering up the bays between the joists and the nailed edge of the last clapboard. Next from an original tail that was cut off, I made a template for a fake tail that will be mounted every 24 inches like the originals and secured from the back side of the 1x6. Finally, bead board will be mounted along the top of this and screwed down though the tails. This was made in one 22 foot long piece and had to have a staggered joint in the middle between the 1x6 and bead board section. A scrap was secured to the 1x6 just to hold the joint in place while the assembly up and mounted. The bead board was spliced in the middle of tail and needed no reinforcement. A nailer was also added in the bay where the 1x6 joint would land on the wall.
And here it is in place on the house, secured both to the wall and through the overhanging roof sheathing. In the end it turned out as good as I could hope and you would be fooled that this is a mounted assembly and not part of the rafters and roof construction. And strength wise, well I stood on the edge and it didn't move at all - rock solid. Once the drips are added along the edges, the seams are all covered and the illusion is complete.
can you tell??
Now, finally was time for the shingles. I added the drips and starter coarse along the edge and sides. Then started shingling. This part really wasn't hard and what they say about the architectural shingles having almost no waste really is true - almost none. Once I reached the flashing point I rolled tar paper along the top section of roof and up onto the wall. I've added a temporary piece of flashing while my dad makes up some nice heavy galvanized section at work, since they have a nice wide break there. Once this is installed, a last section of shingles will be cut and glued on top of the flashing, and a starter coarse of cedar shakes will be mounted over the wall section of flashing.This will hopefully suffice until next year when I start the second story siding job.
I think I'll wait next till year to do the roof on the garage!
Saturday, May 19, 2007
Waiting For Shingles (and more discoveries)
Since Thursday I've been working on the back roof project - and like the old saying goes - what you plan on doing and what you find are always two different things. I'm too whooped to go onto it yet, but let's just say three layers of roof and lots of rot to deal with. It looks like there will be a happy ending though thanks to my buddy John lending a needed hand and ideas - it's just about done and really looks good now.
what's under here??
While removing the bottom courses of cedar shingles tonight where the roof meets the main house in order to start flashing the new roof - I uncovered these goodies. It's a John Wanamaker box lid with L. N. Hall and the house address plus a sheet from Philadelphia Public Ledger - Dec. 26, 1917. I suppose Norris must have had to do a patch job on the siding to fix a leak and the box top was from a Christmas present he gave to Lulu that he decided to shove in there with a newspaper for me to find 90 years later.....
Thursday, May 10, 2007
A Little Of This - Little Of That
new bead board soffet
This afternoon I helped my buddy John make a lumber run with my truck and frame out a deck at his girlfriends house. This is another foursquare about the same age as the Hall house except brick construction. What's cool about this place is that it's pretty much untouched and has some impressive original woodwork in original finish and leaded glass work.
Also added a few more paint samples for outside. We finally have settled on a color - it's the middle one in the pic. It's called "Field of Pines" - made by Valspar. This will be the body color in flat, then trimmed out in standard semi-gloss white. This should look good with the stonework. The green will also be used to accent the mostly white porch. I'm debating using a dark red just on the window sills to add a little "something", but I might just keep things simple. We'll see.
This should be pretty much it till next week - I work all weekend and then going to Cape May for three days staying at a restored B&B. Cape May is a really neat town, like stepping back in time. Should definitely get a little needed inspiration (and even some relaxing time!)
Sunday, May 6, 2007
Dining Room Wall Con't...
Saturday, May 5, 2007
Dining Room Windows And Siding - Officially Retired!
With the destruction done, it was time to happily remove the 1970's windows - and none too soon. The left one almost fell apart taking it out. Next was adding the filler pieces up top like the parlor windows and window stop. I couldn't do the sides until the new window was in, because of the design of the sill which inside is higher than part that the window sits on.
Best thing about the old windows was their scrap value
A few hours later I had all three windows shimmed and secured. Next was a quick sanding of the woodwork and applied a hardener to some areas that had degraded and/or split open. Tomorrow the wood will get some filler and another sand, a coat of primer, and the side window stops can be installed. I need to order siding shingles - I finally decided on the HardiShingle since I was happy with their clapboards I used on the back. If I'm satisfied with the first floor installation than I will use them when I do the second/third floors. If not then it will be pre-primed white cedar, which will no doubt be more frequent maintenance than the fiberboard. I know nothing will look exactly like real cedar, but I'm hoping it's close enough. At least it's not vinyl which just isn't right for this type of house.
Nice new windows with our nice "new" antique oak dining table
New columns ready for prime and paint