This tongue twister about sums up this phase of the restoration. The back addition on the house has seen numerous changes through the years, some minor, and another quite major one. Now I was about to add another major one to it's history - though hopefully one a bit better than a "re muddle".

Studs cut and ready for window framing

North side new sheathing
With the south end completed and new window fitted, it was on to the north end to complete the wall reconstruction. This end was a breeze, just replace the sheathing and added a few filler pieces to re size the framing for the new window.

Walls, door and windows complete from inside.
With the walls completed, I removed the windows that were temporarily installed so I could wrap the structure in Tyvek. I actually wrapped the outside corners first with roofing paper for added security and at the inside corner I ran a piece down half on the addition and half exposed for the main house. When I redo the siding on the main house I can tuck this flap underneath the new siding and that way this critical corner will be nice and tight instead of having a seam here. Then everything was wrapped in the Tyvek paper and taped with the special Tyvek tape. The windows were then installed permanently using the rubber membrane tape around the framing, folding the Tyvek around to the interior, then topped with foil tape after the window was shimmed and secured.


Much, much better now...
Saturday, January 13, 2007
Somebody's Been Eating My House....


So after taking off the clapboards and trim, the story was revealed - some body's been over for dinner.... and they brought the whole family.

... no wonder this corner felt "bouncy"
So like every other project (why should this one be any different) - it just got unexpectedly bigger. After studying it a bit, all was not so bad, those pesky termites didn't stay for dessert. Looking at the construction, what was ate up was the first four feet of the outer floor joist, actually a doubled up one. There are 4 support beams which run from the stone foundation of the main house and tie to the brick footers. Then the floor framing rests on top of these beams. Nothing major in the floor had been touched and best of all they never made their way up the corner studs. So ended up just a matter of replacing the damage. Plus I didn't even need to support the corner of the house while making the repair.

I was able to stagger the joint from old to new since it was two 2x10's sistered together for this end joist/ledger making for a strong transition. There will be a 2x8 on the outside for a deck and another 2x10 on the inside to support the new floor sandwiching this all together - making this corner stronger now than when it was built.
Note: the cinderblock is just filler between the original brick footers that was added sometime in the past to block drafts.
Much better now.
Friday, January 12, 2007
Clear As Mud

1906
The first drawing shows to the best of my knowledge the original 1906 floorplan of the 1st story.
1971
The next drawing shows the 1971 conversion into two apartment. All major changes from original are shown in red. Note all the radiators are changed out from the larger tube to smaller thin tube units. A wall is constructed through the foyer and back stairs is walled off to make a first floor apartment. The back porch is enclosed and half the mudroom used to make a bathroom for this apartment. Also the gas fireplace in the foyer is walled off. And we won't even go into the destruction that was done to the cosmetics....

2006
The final drawing shows the plan we have come up with to put back some of the original details and change some other (in red). In the foyer the staircase bench will be rebuilt, the fireplace restored, original style radiator back, and of course the wall long gone. The dining room will also see an original style radiator back and the window seat restored. In the parlor the radiator here will be located back in it's original location and also replaced back to an original style. Also here I will be adding a fireplace / wood stove. The kitchen will see the biggest change with the pantry and original mudroom footprints combined to make a larger kitchen. The original porch footprint will become a powder room, especially since the plumbing is already there. A few more radiators will be installed and a few windows added to the back addition. Also there will be a built in pantry cabinet and shelves around the heater chimney, and a built in hutch will be added. Between them and the powder room will be a closet for the dishwasher (and freezer if we use the monitor top fridge). The sink will move to the opposite wall to make room for this hutch.
Thursday, January 11, 2007
I Did It - EBAY
And all I can say friends is I did good - REAL GOOD!



The White House Line
Janes & Kirtland, N.Y.

Of course you need a place to eat, so here is a 1930's enamel top kitchen set, complete with pull out extension and silverware drawer... and a huge bonus - 6 original matching chairs! I sometimes will see 4 but never ever have come across a set with 6.
And here's the only non-EBAY find, but a local yard sale score. A neat early roaster that needs a little TLC, but cleaned up will sit nice in a corner. Plus bottom has storage and overall will really add to the "look" I'm going for.

and finally a 1931 Monitor Top fridge......but

then I stepped up to the optional 1930 two door model - and yep, after a little tweek'n she purrs like a kitten and can chill with the best of 'em. And what about the first one?? Who cares - only cost me a penny! Does need some work though.
Wednesday, January 10, 2007
Back to the show


library slip, valentines, x-mas tag, paper doll, matches,
Gillette blades, hair pin, receipt (1947)
game pieces
Tuesday, January 9, 2007
Hall Who??
Norris & Louisa Hall wedding (seated in rockers)
September 5, 1905
Chester Times - June 21, 1952
L. Norris Hall Dies at 73
L. Norris Hall, prominent Delaware Countian and widely known steel merchant with warehouses in Philadelphia, died at 3 a.m. today in Taylor Hospital, Ridley Park. He would have been 74 on July 14.
Mr. Hall entered the hospital on Tuesday, June 10, following a stroke suffered the day before in Ocean City, N.J. He drove his car, however, from the shore resort to his Ridley Park home, with Mrs. Hall. Pneumonia complicated his condition following admission to the hospital. For the past week his right side was paralyzed.
Until his illness, Mr. Hall had been president of the board of managers of Taylor Hospital. He was a leader in the hospital's recent campaign for funds to enlarge the institution.
A resident of Ridley Park since 1905, he had been a real estate assessor in the borough, later serving 12 years as tax collector and four years as burgess.
Active in Church
Ridley Park Methodist Church had Mr. Hall's devoted interest. He served for 25 years as superintendent of its Sunday school. Mr. Hall had been president of the church board of trustees and chairman of the finance committee.
Mr. Hall was born July 14, 1878 at Mt. Hope, near Village Green. His parents were the late Samuel H. and Sarah J. Hall. He attended public schools in Aston Mills and Village Green, Darby Friends' School, Drexel Institute and the Wharton School of the University of Pennsylvania.
Showing an early interest in telegraphy, Mr. Hall became telegraph operator at Glenolden station on the Pennsylvania Railroad. Later he operated signal towers for the railroad between Philadelphia and Washington. He then joined Western Union Telegraph Co., and in 1903 he was appointed to operate a special private wire from Philadelphia to Pittsburgh for the Carnegie Steel Corp.
From telegraph operator, Mr. Hall became a steel salesman for Carnegie, and during World War I, he was in charge of all export steel shipments to the shipyards of Japan.
Established in 1921
In 1921, Mr. Hall established his own steel warehousing firm, L. Norris Hall, Inc., with headquarters in Philadelphia. The firm supplies miscellaneous iron and steel products to industrial plants in the Philadelphia Metropolitan area.
Always deeply interested in the welfare of his neighbors, Mr. Hall was active in a number of community agencies. Years before Delaware County was organized for Red Feather campaigns, Mr. Hall and the late Carl Hennicke, of Ridley Park, with the assistance of Boy Scouts, collected funds and purchased food, fuel and clothing for needy families in the borough and Ridley Township.
Later he was a founder of the Community Welfare of Ridley Park. More than 50 Christmas baskets were assembled at Ridley Park borough hall each Christmas by this organization and delivered to needy families.
Chester Kiwanis Club was a special interest of Mr. Hall's and he was a past president and was an active supporter of it's boys and girl's work. One of his most recent benefactions was to donate steel for construction of stands in Chester's Little League Park, 9th and Ridley Creek.
Bank Official
Mr. Hall was vice -president and a director of Ridley Park National Bank. He was a 32nd degree mason and a past master of Prospect Lodge 578, and a director of Delaware County Chamber of Commerce.
In 1905, Mr. Hall married the former Louise Belle Dutton, of Twin Oaks, who survives.
Other survivors include a son, Wallace D., of Wynnewood, a vice-president of L. Norris Hall, Inc., two daughters, Mrs. Leroy Layton Jr., of Aronomink, and Mrs. A. Wesley Hoge, of Ridley Park. Another son, Gilbert N., is deceased."

L. Norris Hall - 1940
Monday, January 8, 2007
What's Cooking in the Kitchen?
At this point we knew the first floor would be a total gut. No surprises here.


This time I was surprised not to find any gas lighting - it was all electric only. I lucked out with the linoleum flooring, which at the Glenolden house took me days to get up. Here the old one piece floor was at the bottom of the layers with 3 more on top. When it was installed, only the perimeter was glued so when I got under it with pry bars, all the layers came up together with little effort. I took it up in 4 foot sections and what I thought would be a day or two job - took an hour! I'll take any good news at this point....







I decided the best idea was to open up the kitchen, pantry, hall, and half of the bath into one kitchen room, and then make the 8 x 6 section that was originally the open porch into a smaller powder room. I didn't need the 8 x 12 bath back there now. Since the back had been re muddled so many times, I didn't feel bad about doing this to the house. I figured I would have to add a piece of steel to reinforce the end joist after removing the back wall - but as it happens in these old houses, you never know what to expect to find.


With the back opened up, I now had a clean slate to design a kitchen in - but this would prove to be quite a challenge with an unusual footprint to work around. Plus what started out as purchasing a vintage stove to use in a modern "vintage look" kitchen would turn into a full authentic 1930's kitchen!